Chemical Dosing Skid
Key Features
Portable Design
Skid Design for Pump and Storage system
Control System Inside
Certifications:
China GB
Function:
N2 Purging: During accelerated dry outs, the -70°C dew point of Nitrogen promotes efficient removal of moisture from process systems which translates into time and cost savings. In addition to hot stripping and accelerated drying, we are able to address a multitude of other hot Nitrogen application needs, with a host of application specialists at your service.
Specification:
13.67GPH(7bar/100Psi)
11.72 GPH (103.4bar/1500Psi)
Tank Container Size:
Length: 9600mm
Width: 2200mm
Height: 2700mm